Your Capitol Granite Customer Guide

Your Template & Installation Guide

Everything you need to know — from the day we measure your space to the moment you're admiring your finished countertops. We've outlined each step so there are no surprises, just results.

01

Template Day

Precision measuring of your space

Templating is how we capture the exact dimensions of your space. Our team uses digital laser-templating technology to map every inch of your layout — ensuring your stone is cut to a perfect fit before a single slab is touched.

What We're Doing

Our technician will digitally map your cabinets, walls, and cutout locations for sinks, cooktops, and any special features. This template drives the entire fabrication process.

How Long It Takes

Most residential template appointments take 30–90 minutes depending on the size and complexity of your project. Larger kitchens or unique layouts may take a bit longer.

Who Should Be There

We ask that a homeowner or authorized decision-maker be present during templating to confirm sink placement, edge profiles, and any design decisions that affect the final cut.

Your Capitol Granite Customer Guide

Before We Arrive for Templating

A little preparation on your end ensures our technician can work efficiently and capture everything accurately on the first visit.

Cabinets must be fully installed & level

All base cabinets, islands, and peninsula structures need to be complete, secured, and level before we can template. We cannot template over unfinished or temporary cabinetry.

Have your sink on-site or farm sink installed

If you've purchased an undermount sink, it needs to be physically on-site so our technician can trace the exact cutout. Farm sinks need to be installed and not moved after template for a proper cutout..

Know your faucet hole preferences

Decide in advance how many faucet holes you need and where you'd like them placed. Once the slab is cut, changes are not possible.

Clear the countertop area

Remove any items from your current counters and surrounding areas so our tech has open, unobstructed access to all surfaces being measured.

Don't have unfinished drywall or backsplash tile pending

If you plan to tile directly to the countertop, confirm with your tile contractor how the tile will terminate. Changes after template may affect fit.

Don't forget cooktop cutouts

If you have a drop-in or slide-in cooktop, have the model number or installation manual ready. Gas line or electrical rough-ins should already be in their final position.

Discuss seam placement ahead of time

For larger countertop runs, seams may be necessary. Talk to your project coordinator before template day if you have strong preferences about seam location.

Note any appliance clearances

Dishwasher, refrigerator, and range clearances should be confirmed. Let us know about any appliances that sit unusually high or require special consideration.

02

Fabrication

Precision measuring of your space

After templating, your digital measurements go straight to our fabrication team. This is where your slab is cut, polished, and prepped — transforming raw stone into the countertops designed specifically for your home.

Digital Template Transfer

Once received, our CAD department makes the final touches to ensure everything is accounted for and prepares the files for the CNC fabrication system.This eliminates human error and ensuring every cut is precise to the millimeter.

Slab Layout & Seam Planning

Our fabricators lay out your template on the actual slab, optimizing for grain direction, pattern flow, and minimal seaming. This is where the art of stone work really shines.

Cutting, Shaping & Edge Work

Your countertops are cut to shape, sink and cooktop openings are routed, and your chosen edge profile is applied and hand-polished.

Quality Check

Before leaving our shop, every piece is inspected for accuracy, finish quality, and consistency — so install day goes smoothly.

Typical Turnaround

Fabrication typically takes 7–14 business days from the template date, depending on current workload and material availability. Your project coordinator will give you a specific timeline.

03

Getting Ready for Install Day

What you need to do in advance

A smooth installation starts with good preparation. Here's what needs to be done before our crew arrives with your new countertops.

Pathing. Installers need space to carry those heavy surfaces to the working area. A clear path ensures easy and safe navigation.

Parking. Installers drive big trucks and close access to the entrance for offloading is essential. Please allow them to park in your driveway.

Removal. If no service is requested, old countertops must be removed, prior to arrival. Removal services by Capitol Granite must be arranged in advance.


Clearing. If we are removing the old countertops, please take off all items from your surfaces.

Clearing. Remove all items in the sink and cooktop cabinets and take out top cabinet drawers. This helps with mounting, fitting and shimming.

Items Required: Sinks, faucets, accessories and/or cooktops are on site.

Appliances: If they obstruct access, appliances are moved out of the work area.

Cover: If desired, protect your flooring, appliances, or furniture with protective padding.

Plumbing & Gas: If no removal service is requested, ensure plumbing remains disconnected prior to arrival. Gas must be shut off and disconnected. Connection services by Capitol Granite must be arranged in advance.

Electric Cooktops: Disconnection should be done prior to arrival. We do not offer services for disconnection or reconnection.

Safety: Pets are secured and children are kept clear of the work area.

Homeowner: A decision maker should be home for the duration of the installation.

Dust & Stone Cutting On-Site

In some cases, minor adjustments or scribe cuts may be made on-site. This can produce a small amount of dust or noise. We take care to protect surrounding surfaces and clean up after ourselves.

Caulk Cure Time

Caulk applied along walls and around sinks typically takes 24 hours to fully cure. Avoid getting that area wet or placing items directly against it during that period.

Check Cabinet Level

If you have done your own removal, now is the best time to double check your cabinets. If your cabinets are beyond 1/4" out of level, please let us know prior to installation.

04

Install Day

What to expect while we're there

Our installation crew takes pride in precision and professionalism. Here's a look at how your install day will unfold from arrival to completion.

Arrival & Setup

Our crew will arrive in the scheduled window, bring slabs inside using protective padding, and lay out all pieces to confirm placement before any adhesive is applied.

Placement & Leveling

Countertops are shimmed and leveled as needed, secured to the cabinet framework, and seams are bonded and color-matched with precision epoxy.

Final Touches

Seams are finished and buffed, caulk is applied at walls and backsplash transitions, and the entire surface is cleaned and inspected before we consider the job done.

Walkthrough With You

Before we leave, we'll walk through with you to review the finished installation. This is the time to flag any concerns — we want you completely satisfied before we go.

05

After Installation

Caring for your new stone surfaces

Your countertops are built to last a lifetime with proper care. These quick guidelines will help protect your investment and keep your surfaces looking exceptional for years to come.

Wait 24 hours before using the sink

Allow your plumber to reconnect plumbing after we've finished, and give caulk seals time to fully cure before running water.

Use pH-neutral cleaners

For daily cleaning, use a mild dish soap and warm water or a stone-safe cleaner. Avoid abrasive scrubbers that can dull the finish over time.

Seal natural stone annually

Granite and other natural stones benefit from resealing once a year. We're happy to advise on the right sealer for your specific material. Quartz surfaces do not require sealing.

Use trivets for hot items

While natural stone is heat-resistant, sudden temperature changes and direct heat from pans can potentially stress the stone or affect the finish over time.

Don't use harsh chemicals

Bleach, ammonia, vinegar, and acidic cleaners can etch the surface of natural stone. Stick to products specifically formulated for stone surfaces.

Don't cut directly on the stone

Use a cutting board. While stone is hard, repeated knife contact can micro-scratch the polished surface over time — and it's hard on your knives too.

Don't sit or stand on the countertops

Stone countertops are strong but are not designed to support the concentrated point load of a person's weight. This can cause cracking near unsupported spans or cutout areas.

Review your warranty details

Capitol Granite stands behind our work. Visit our Warranty Info page or contact us directly with any questions about coverage for your specific installation.

Common Questions

Frequently Asked Questions

Have a question not covered here? Give us a call at (804) 379-2641 or reach out through our website — we're happy to help.

Can I use my kitchen during fabrication?

Yes — fabrication happens at our shop. Your home won't be disrupted between template and install day. Just plan ahead for the day of installation when the kitchen will be out of use.

What happens if something doesn't look right after install?

Contact us right away. We want every customer to be completely happy with their installation. Our team will work with you to address any concerns as quickly as possible.

What if my cabinets shift between template and install?

Even small movement can affect fit. Avoid adjusting, loading, or modifying cabinets after templating. If something changes, contact us immediately so we can address it before install.

How do seams look?

Our fabricators blend seams using color-matched epoxy and careful polishing to make them as inconspicuous as possible. Seam visibility varies by stone pattern and color.

Do you remove the old countertops?

Countertop removal is typically the homeowner's responsibility. If you'd like us to handle removal, please discuss this with your project coordinator in advance as it may affect scheduling.

Can I be home the whole time?

Yes, and we encourage it. A homeowner or representative should be present from start to finish to answer questions, confirm decisions, and sign off on the completed walkthrough.

Questions? We're Here for You.

Our team has guided homeowners through this process for over 20 years. Reach out any time — before, during, or after your project.